Trump blasts cost overruns at Obama Presidential Center in Chicago

Spread the love

(The Center Square) – Chicago is back in the mind of President Donald Trump, but this time the commander-in-chief’s focus is on delays and cost overruns at the Obama Presidential Center.

While campaigning for Democratic Party political candidates, former President Barack Obama criticized Trump over White House renovation projects and reductions in federal food assistance.

Trump referred to Obama’s comments during a speech Wednesday at the American Business Forum in Miami.

“‘I’m talking Donald Trump is a mean person.’ I’m not a mean person. I just want to have a country that’s great again, is that OK?” Trump said.

The Obama Presidential Center is scheduled to open next spring on Chicago’s South Side, although the project has been delayed several times and the estimated construction costs have surged from an initial number around $350 million to at least $830 million.

“Ask him how he’s doing on his museum library. He’s got hundreds of millions of dollars of cost overruns. It’s come to a dead halt. He built it in not a particularly good location. He’s not into real estate, you know, he doesn’t know about location,” Trump said.

The president called out Obama again during an unrelated announcement at the White House on Thursday.

“The beautiful Obama building that he’s building in Chicago for the museum, which is now shuttered up, and they couldn’t finish it, what did you say, about five years behind schedule and about 2,000% over budget, then he tells us how to run Medicaid,” Trump said.

The Obama Presidential Center did not immediately respond to a request for comment.

The development has faced criticism from environmental groups and community advocates on Chicago’s South Side. The project resulted in hundreds of trees being cut down in Jackson Park.

Earlier this year, an engineering firm working on the center said claims it racially discriminated against a Black-owned subcontractor on the project were baseless. The New York-City-based engineering firm was responding to a lawsuit accusing it of acting with racist intent when it criticized the alleged underperformance of a Black-owned concrete subcontracting firm. The suit drew national attention to the diversity, equity and inclusion goals connected to the project.

Groundbreaking for the center was held in 2021. According to the Obama Foundation website, the Obama Presidential Center is scheduled to open in 2026.

Catrina Barker and Kevin Bessler contributed to this story.

Leave a Comment





Latest News Stories

TSA agents who worked throughout shutdown to receive $10,000 bonus

TSA agents who worked throughout shutdown to receive $10,000 bonus

By Thérèse BoudreauxThe Center Square The Department of Homeland Security will issue $10,000 bonus checks to Transportation Security Administration (TSA) agents who demonstrated “exemplary” behavior and work attendance during the...
Boeing to pay $36M to family of Indian woman killed in Ethiopia Air crash

Boeing to pay $36M to family of Indian woman killed in Ethiopia Air crash

By Jonathan Bilyk | Legal NewslineThe Center Square The family of a woman from India who died in a 2019 airliner crash could receive nearly $35 million from Boeing, under...
Pro-life org invests $80M into 2026 midterms, will reach 10.5M voters

Pro-life org invests $80M into 2026 midterms, will reach 10.5M voters

By Tate MillerThe Center Square Susan B. Anthony Pro-Life America says it will reach 10.5 million voters by its newly announced investment of $80 million into the 2026 midterm election,...
Refilling Strategic Petroleum Reserve begins

Refilling Strategic Petroleum Reserve begins

By Alton WallaceThe Center Square About 1 million barrels of crude oil that will go toward replenishing the nation’s Strategic Petroleum Reserve have been purchased, the U.S. Department of Energy...

WATCH: Lawmakers call out Pritzker for lack of transparency with budget cuts

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois lawmakers say they are not getting information from Gov. J.B. Pritzker or state agencies about the...
Report: Barriers to social mobility largely manmade

Report: Barriers to social mobility largely manmade

By Tate MillerThe Center Square Authors of a new report on social mobility across the 50 states said that barriers to social mobility are largely “man-made” and can be solved...
Fetterman hospitalized for heart episode

Fetterman hospitalized for heart episode

By Christen SmithThe Center Square Pennsylvania Democratic U.S. Sen. John Fetterman remains under observation at a Pittsburgh-area hospital following a heart episode early Thursday. The senator’s spokesman posted to his...
Federal services to slowly recover following end of government shutdown

Federal services to slowly recover following end of government shutdown

By Thérèse BoudreauxThe Center Square With the longest government shutdown in history finally over, federal agencies are slowly bringing affected services back online and hoping to resume normal operations by...
IL congressman pushes military to accept CLT, experts say it could shape education

IL congressman pushes military to accept CLT, experts say it could shape education

By Catrina Barker contributiorThe Center Square An Illinois congressman is pushing to expand testing options at U.S. service academies, a move experts say could revive academic rigor and expand access...
MS-13 members prosecuted nationwide for brutal murders, fentanyl trafficking

MS-13 members prosecuted nationwide for brutal murders, fentanyl trafficking

By Bethany BlankleyThe Center Square Federal, state and local law enforcement officers continue to target Mara Salvatrucha (MS-13) U.S.-Salvadoran transnational gang members nationwide. MS-13 was designated as a foreign terrorist...
Lakers Volleyball Claims Region XXIV Championship

Lakers Volleyball Claims Region XXIV Championship

Featured photo caption: The Lake Land College volleyball team defeated the Vincennes University Trailblazers on Sunday, Nov. 2 to claim the Lakers’ first Region XXIV Championship since 2014. Pictured back...
Illinois, Chicago residents rank high taxes as state’s top issue

Illinois, Chicago residents rank high taxes as state’s top issue

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – With the state now losing a resident to another state every nine minutes and more than...
Jan. 6 panel cost twice previous estimates, hiring TV producers to dramatize attack

Jan. 6 panel cost twice previous estimates, hiring TV producers to dramatize attack

By Mark StricherzThe Center Square The U.S. House select committee that investigated the Jan. 6, 2021, attack on the U.S. Capitol cost almost twice as much as previously reported, including...
00-KianDavisInteception

Road Warriors: Casey-Westfield Overwhelms Nokomis 48-14 to Rumble into IHSA Elite 8

Feature photo caption: Kian Davis comes away with a fourth-quarter interception and returns it deep into Nokomis territory. Davis's takeaway set up the Warriors' final touchdown of the game, helping...
00MadiGelbGetsTheBlock

Lady Warriors’ Season Ends in Hard-Fought Regional Championship Loss to ALAH

Featured photo caption: Madilyn Gelb forms a solid wall at the net, shutting down an opponent's attack with a block. Gelb contributed two blocks and was also one of the...