Casey Library Board Advances Expansion Plans, Selects Ramp Design
Casey Township Library Board Meeting | Nov. 2025
Article Summary: The Casey Township Library Board moved forward with plans for a building addition, holding a special meeting to address specific design elements regarding accessibility. Trustees voted to approve a ramp design that prioritizes space for motorized wheelchairs and discussed internal layout changes.
Casey Township Library Expansion Key Points:
-
Ramp Approval: The board approved a ramp proposal situated close to the building with extra space to eliminate tight turns for motorized wheelchairs.
-
Interior Adjustments: Trustees agreed to place the custodial closet in the current women’s bathroom and requested 40-inch doors for better accessibility.
-
Capital Campaign: The Friends of the Library is preparing a capital campaign, which will feature a “thermometer” sign recognizing donors contributing $20,000 or more.
-
Architectural Updates: Updated prints were presented by Corodogan Clark, prompting a review of the building’s “Legacy Wall” and cost-effectiveness.
The Casey Township Library Board on Friday, November 14, 2025, voted to approve a specific ramp design for a proposed building addition, culminating discussions that began during a regular meeting earlier in the month.
During a special meeting called specifically to address the expansion, the board reviewed updated prints from the architectural firm Corodogan Clark. The primary focus of the session was ensuring the new addition is fully compliant with the Americans with Disabilities Act (ADA).
Board President Susie Mathews called the meeting to order with the intent to decide on ramp options. Following a discussion regarding the definition of wheelchairs allowed in the building—specifically scooters and motorized models—the board voted to construct a ramp proposal located close to the building. The approved design includes additional space to eliminate tight turns, facilitating easier access for motorized wheelchairs.
Trustees also discussed the specific curvature of the ramp and the potential need for fill dirt to raise the parking elevation.
Inside the proposed structure, the board agreed to place a custodial closet in the location of the current women’s bathroom. To further assist with accessibility, the board discussed ensuring that the door to the new addition and bathroom doors be 40 inches wide.
Questions were raised during the special meeting regarding construction costs, the overall cost-effectiveness of the current prints, and whether union contractors would be required for the public building project. Trustees also noted the need for a front rendering of the building that includes a “Legacy Wall.”
The expansion planning began at the board’s regular meeting on Thursday, November 6, 2025. During that session, Friends of the Library (FCTL) President Tom Daughhetee reported that the fundraising committee is gathering information for a capital campaign to support the new addition. Daughhetee noted that a building fund “thermometer” sign will be erected to list the names of donors contributing $20,000 or more.
Latest News Stories
Illinois corrections officials say they are on schedule for prison mail scan rule
Calhoun’s Late Touchdown Ends Casey-Westfield’s Playoff Run, 28-21
DOJ probes Berkeley riot; Illinois TPUSA warns hostility isn’t just in California
‘Consequential’ day ahead for future household electricity costs
WATCH: Chicago committee rejects proposed tax hikes; Hemp industry wants regulation
Illinois quick hits: Bipartisan BABES Enhancement Act ready for Trump
Clark County Approves New Heating System for Animal Control Building After Pipes Freeze
Chicago council committee rejects mayor’s proposed tax hikes
Illinois quick hits: Elections board considers primary election petition objections
Feds: Illegal commercial drivers licenses issued in California
Socialist candidate runs against Los Angeles mayor
193 youth in care of Illinois’ child welfare agency missing in 2025