Casey Library Board Advances Expansion Plans, Selects Ramp Design
Casey Township Library Board Meeting | Nov. 2025
Article Summary: The Casey Township Library Board moved forward with plans for a building addition, holding a special meeting to address specific design elements regarding accessibility. Trustees voted to approve a ramp design that prioritizes space for motorized wheelchairs and discussed internal layout changes.
Casey Township Library Expansion Key Points:
-
Ramp Approval: The board approved a ramp proposal situated close to the building with extra space to eliminate tight turns for motorized wheelchairs.
-
Interior Adjustments: Trustees agreed to place the custodial closet in the current women’s bathroom and requested 40-inch doors for better accessibility.
-
Capital Campaign: The Friends of the Library is preparing a capital campaign, which will feature a “thermometer” sign recognizing donors contributing $20,000 or more.
-
Architectural Updates: Updated prints were presented by Corodogan Clark, prompting a review of the building’s “Legacy Wall” and cost-effectiveness.
The Casey Township Library Board on Friday, November 14, 2025, voted to approve a specific ramp design for a proposed building addition, culminating discussions that began during a regular meeting earlier in the month.
During a special meeting called specifically to address the expansion, the board reviewed updated prints from the architectural firm Corodogan Clark. The primary focus of the session was ensuring the new addition is fully compliant with the Americans with Disabilities Act (ADA).
Board President Susie Mathews called the meeting to order with the intent to decide on ramp options. Following a discussion regarding the definition of wheelchairs allowed in the building—specifically scooters and motorized models—the board voted to construct a ramp proposal located close to the building. The approved design includes additional space to eliminate tight turns, facilitating easier access for motorized wheelchairs.
Trustees also discussed the specific curvature of the ramp and the potential need for fill dirt to raise the parking elevation.
Inside the proposed structure, the board agreed to place a custodial closet in the location of the current women’s bathroom. To further assist with accessibility, the board discussed ensuring that the door to the new addition and bathroom doors be 40 inches wide.
Questions were raised during the special meeting regarding construction costs, the overall cost-effectiveness of the current prints, and whether union contractors would be required for the public building project. Trustees also noted the need for a front rendering of the building that includes a “Legacy Wall.”
The expansion planning began at the board’s regular meeting on Thursday, November 6, 2025. During that session, Friends of the Library (FCTL) President Tom Daughhetee reported that the fundraising committee is gathering information for a capital campaign to support the new addition. Daughhetee noted that a building fund “thermometer” sign will be erected to list the names of donors contributing $20,000 or more.
Latest News Stories
WATCH: Businesses argue Congress holds purse strings in tariff challenge
Report: FEMA under Biden politically discriminated against Americans
Trump begins accepting $100k visa payments
Vance optimistic with Gaza peace plan; reiterates no U.S. troops to be on the ground
Poll: Majority of Americans do not support National Guard to deter crime
‘Legal minefield:’ Biometrics reforms needed to keep IL tech biz growing
Warriors Fall to Olney 28-27 in Heartbreaking Battle for Little Illini Title
As military branches celebrate 250 years, Democrats vote against paying them
Chicago transit violent crime at 7 year high, funding concerns persist
WATCH: National Guard case before SCOTUS; Trump insists China soybean deal coming
Illinois quick hits: Harvey furloughs some employees; lead poisoning prevention continues
Illinois quick hits: Filings made to SCOTUS in National Guard case; Chicago sued DHS