Casey Library Board Advances Expansion Plans, Selects Ramp Design
Casey Township Library Board Meeting | Nov. 2025
Article Summary: The Casey Township Library Board moved forward with plans for a building addition, holding a special meeting to address specific design elements regarding accessibility. Trustees voted to approve a ramp design that prioritizes space for motorized wheelchairs and discussed internal layout changes.
Casey Township Library Expansion Key Points:
-
Ramp Approval: The board approved a ramp proposal situated close to the building with extra space to eliminate tight turns for motorized wheelchairs.
-
Interior Adjustments: Trustees agreed to place the custodial closet in the current women’s bathroom and requested 40-inch doors for better accessibility.
-
Capital Campaign: The Friends of the Library is preparing a capital campaign, which will feature a “thermometer” sign recognizing donors contributing $20,000 or more.
-
Architectural Updates: Updated prints were presented by Corodogan Clark, prompting a review of the building’s “Legacy Wall” and cost-effectiveness.
The Casey Township Library Board on Friday, November 14, 2025, voted to approve a specific ramp design for a proposed building addition, culminating discussions that began during a regular meeting earlier in the month.
During a special meeting called specifically to address the expansion, the board reviewed updated prints from the architectural firm Corodogan Clark. The primary focus of the session was ensuring the new addition is fully compliant with the Americans with Disabilities Act (ADA).
Board President Susie Mathews called the meeting to order with the intent to decide on ramp options. Following a discussion regarding the definition of wheelchairs allowed in the building—specifically scooters and motorized models—the board voted to construct a ramp proposal located close to the building. The approved design includes additional space to eliminate tight turns, facilitating easier access for motorized wheelchairs.
Trustees also discussed the specific curvature of the ramp and the potential need for fill dirt to raise the parking elevation.
Inside the proposed structure, the board agreed to place a custodial closet in the location of the current women’s bathroom. To further assist with accessibility, the board discussed ensuring that the door to the new addition and bathroom doors be 40 inches wide.
Questions were raised during the special meeting regarding construction costs, the overall cost-effectiveness of the current prints, and whether union contractors would be required for the public building project. Trustees also noted the need for a front rendering of the building that includes a “Legacy Wall.”
The expansion planning began at the board’s regular meeting on Thursday, November 6, 2025. During that session, Friends of the Library (FCTL) President Tom Daughhetee reported that the fundraising committee is gathering information for a capital campaign to support the new addition. Daughhetee noted that a building fund “thermometer” sign will be erected to list the names of donors contributing $20,000 or more.
Latest News Stories
WATCH: Pritzker says Trump’s first year a failure; Raoul discusses prosecuting fraud
Illinois Quick Hits: Pritzker wants year-round E15 fuel
Report: University diplomas losing value to GenAI
State Grants to Fund Mental Health Support and Trades Training
WATCH: Reclaiming the Panama Canal could be back on the table
Las Vegas tourism industry continues to decline
More states now offer school choice programs for families
Trump likely to make waves at biggest-ever World Economic Forum
Illinois House returns to session with plans for SAFE-T Act, Israel, taxes
Clark County Board Approves Limited Permit for Moonshine Solar Project
Illinois quick hits: Bovino bounty trial to begin; Judge sentences Kentucky man to 15 years in drugs case; Pritzker criticizes Trump’s first year as Trump marks accomplishments
IL AG reviews battles vs. Trump administration: ‘365 days of chaos’